Kentucky Utilities
- E.W. Brown Station Unit #2
- 460 MW Fossil Fired Boiler
- Burner Modification
- May-05
- E.W. Brown Station Unit #3
- 460 MW Fossil Fired Boiler
- Superheat outlet header and 4 outlet link header replacement
- May-05
- Ghent Station
- 2000 MW Fossil Power Generating Station
- Year Turnkey Maintenance Contract
- Ongoing
- Ghent Station Unit #1
- 500 MW Fossil Fired Boiler
- Upper Arch Replacement, Rear Superheat Division Panel Replacement
- Mar-05
- Ghent Station Unit #2
- 500 MW Fossil Fired Boiler
- Rear Superheat Division Panel Replacement, DMW Final Reheat and Superheat Terminal Tube sets
- Apr-05
- Cane Island Plant
- HRSG
- Retaining Bar Replacement
- Nov-05
- Cane Run
- 750 MW Coal Fire Plant
- Turnkey Maintenance Contract
- Ongoing
- Cane Run Unit #4
- 300 MW Coal Fired Boiler
- Replaced Waterwall, Economizer, Reheater Tubes
- Nov-04
- Cane Run Unit #5
- 180 MW Coal Fired Boiler
- Routine boiler repair following inspection
- May-05
- Cane Run Unit #6
- 270 MW Coal Fired Boiler
- Replacement: Water Platens, Waterwall Panels, Sootblowers Relocation, Routine boiler repair following inspection, Corner Burner Modifications
- May-05
- Mill Creek
- 1470 MW Fossil Power Generating Station
- Turnkey Maintenance Contract
- Ongoing
- Mill Creek Unit #1
- 450 MW Fossil Fired Boiler
- Removed and replaced 60 Superheat Final Pendants and stainless loops, 55 Rear waterwall hanger tubes and 14 water wall panels.
- Oct-06
- Mill Creek Unit #2
- 450 MW Fossil Fired Boiler
- Completed Superheat, reheat&economizer replacements as well as an economizer hopper rebuild. More than 200 craft workers onsite and required extensive rigging, approximately 7,700 tube welds and over 3,000 LF of structural welding.
- May-06
- Mill Creek Unit #2
- 450 MW Coal Fired Boiler
- Burner Modification, install yaw mechanisms
- May-05
- Mill Creek Unit #2
- 450 MW Coal Fired Boiler
- Replaced Waterwall Tubes
- Jun-04
- Mill Creek Unit #3
- 400 MW Fossil Fired Boiler
- Removed and replaced 25 Intermediate Superheat Panels, 275 loose tubes and modifications necessary to accommodate new design.
- May-06
- Tyrone
- 100 MW Fossil Power Generating Station
- Turnkey Maintenance Contract
- Ongoing
- Anclote Station Unit #1
- 522 MW Fossil Fired Dual Furnace Boiler
- Remove and replace 58 LTSH panels, skin casing repairs and replacement, remove and replace one (1) seal box on the front wall and miscellaneous tube, tube shield and structural repairs
- Oct-06
- Anclote Station Unit #2
- 500 MW Oil Fired Boiler
- Removed and replaced 58 LTSH panels, 272 DMWs and 3 seal boxes on the front wall. Outage also included Burner Inspection and maintenance, skin casing repairs, miscellaneous tube, tube shield and structural repairs.
- May-06
- Roxboro, NC
- 770 MW Dual Furnace Boiler
- Replaced High Temp Superheat panels, reheat hanger lugs, burner replacement&miscellaneous boiler repairs. Completed over 5,000 pressure part welds and extensive rigging, totaling more than 70,000 man hours.
- Oct-06
- Alabama Power Plant Franklin
- HRSG
- Superheat Emergency Repair
- Aug-05